Blog

Development of a Trusted Meter prototype successfully accomplished

01.03.2011
/ Fachartikel
Artikel in TECOM Newsletter, 2011 Leseprobe: "Part of the technical work of the TECOM project is the development of proof-of-concept prototypes [1]. The demonstrator prototypes are typically developed from realistic use cases to achieve a most fruitful outcome. One of these demonstrator prototypes is based on the Trusted Meter (hereafter referred as TM), developed by Mixed Mode."